A Practical Guide to Cloud Migration Without the Downtime

June 15, 2024 2 min read

Cloud migrations get feared more than they should be, usually because the horror stories come from migrations that skipped planning and went straight to “let’s just move it and see.”

Move a copy first, not the original

The site or application keeps running on its current infrastructure, untouched, while a full copy is stood up and tested on the new infrastructure. This single decision is what separates a calm migration from a stressful one โ€” there’s always a known-good fallback.

Test with production-like data, not a toy dataset

Performance problems and edge-case bugs hide in real data volumes. A migration that’s only been tested against a handful of sample rows will surface its problems in front of actual users instead of during testing.

Plan the cutover order deliberately

DNS changes, SSL certificates, and database syncing all need to happen in a specific sequence, with email handled carefully so it doesn’t go down mid-migration. Rushing this order is where most “quick migrations” turn into multi-hour outages.

Have a rollback plan you’ve actually tested

Not just a theoretical one. If the cutover doesn’t look right, you need to be able to point things back at the old infrastructure within minutes, not figure it out live while the site is down.

Done this way, a cutover is typically a matter of minutes of actual risk, with the real work โ€” copying, testing, verifying โ€” happening safely beforehand with zero impact on the live site.